EXAMPLES OF PAST TRAINING PROJECTS COMPLETED BY MERLIN GENERAL:
• Reactor core defueling training in preparation for calandria re-tubing
• Fresh core training and testing following calandria re-tubing:
     - Fresh core loading and monitoring
     - Fresh core approach to critical
     - Operating a fresh core reactor and transition to equilibrium core conditions
• Systems modifications training and documentation following refurbishment
• Generator operation and power systems operation training
• Multiple Choice Question testing methodology (train the trainer)
• Set and conducted a certified control room staff Multiple Choice Question (MCQ) examination
• Development of Systematic Approach to Training (SAT) based training material for CNSC initial certification training

EXAMPLES OF PAST ENGINEERING PROJECTS COMPLETED BY MERLIN GENERAL:
• Deep Geological Repository (DGR) Waste Container Preparedness Study
     - Determined the effort required to prepare the existing inventory of L & IL Waste containers for emplacement in the DGR
• Calandria Replacement Study
     - Preliminary engineering design for calandria storage building & access road.
• Pickering Powerhouse
     - Facility improvements to the field office location.
• Pier Settlement Review
     - Completed a third party review, providing observations, comments and recommendations related to pier settlement issues within a client storage building.
• Protection & Control Training Development & Delivery
     - Review of existing materials, development & delivery of a P & C training program to new utility employees.
• Machine Guarding Study
     - Completed a detailed compliance review of guarding requirements of all rotating equipment located at Pickering B, Unit 8.

EXAMPLES OF PAST TECHNICAL PROJECTS COMPLETED BY MERLIN GENERAL:
• Aging Management – Systems & Structure Report
     - Prepared a report documenting the system primary functions (SPFs), system primary support activities & critical components of aging management evaluation of in-ground IC-18 containers.
• Weld Systems Assessment
• Decommissioning of SLOWPOKE Reactor
     - Completed the entire decommissioning of the SLOWPOKE Reactor at the University of Toronto.
• Configuration Management
• Point Lepreau Approach to Critical